The main project of the airport covers mostly in Beijing, is the third passenger airport after Beijing Capital International Airport and Beijing Nanyuan Airport (will be relocated), the current construction of four runways and a dual-use runway (namely Nanyuan New Airport of the Air Force), 700,000 square meters of terminal building, passenger aircraft near 92 seats, planned to be completed by the end of 2019, When the passenger flow reaches 45 million people, the construction of the first satellite hall, so that the terminal area of 820,000 square meters, 137 passenger aircraft near the stand, so that it can meet the design capacity of 72 million people.
Our company provides high and low voltage distribution cabinets, distribution boxes and other products and services.